Product Details
Place of Origin: CHINA
Brand Name: DST
Certification: CE Rosh
Model Number: DMAO-1650
Payment & Shipping Terms
Minimum Order Quantity: 1
Price: Depends on specifications
Packaging Details: parked in wooden
Delivery Time: two months
Payment Terms: L/C
Supply Ability: 50 units per year
Substrate: |
PET、OPP、etc. |
Substrate Width: |
500mm-2450mm |
Substrate Thickness: |
PET 3-12um OPP 3-10um |
Roll Diameter: |
Max.800mm |
Speed: |
Max.600m/min |
Substrate: |
PET、OPP、etc. |
Substrate Width: |
500mm-2450mm |
Substrate Thickness: |
PET 3-12um OPP 3-10um |
Roll Diameter: |
Max.800mm |
Speed: |
Max.600m/min |
Vacuum Winding Copper/Aluminum Metallizing Equipment
Product Description
The DMAR-1650 High Vacuum Roll-to-Roll Dual-Sided Metallizing Equipment is a specialized machine designed using advanced international technology. It enables continuous dual-sided metallization of PET and OPP plastic films by depositing copper or aluminum metal. Through multiple metallization processes, the deposition thickness on each side can reach over 1.0 μm, forming the desired composite metallized film products.
This equipment is ideal for applications requiring high-quality, thick metal coatings on flexible films, such as capacitor films, conductive films, and shielding materials. Let me know if you need further refinements or promotional material based on this description!
Technical Data
Substrate Material & Date
Substrate material | PET |
Substrate Width | 2000 mm |
Drum diameter | Min.1200 mm |
Drum Width | Max.2000 mm |
Chamber Input Power | X=65 mm |
High Vacuum Roll-to-Roll Coating Process
Step | Description |
---|---|
Start | Begin the coating process. |
Vacuum System Activation & Preheating | Start the vacuum system, preheat, check cooling and heating systems, and conduct system inspection. |
Loading Base Film & Threading | Load the base film material and thread it through the system. |
Chamber Sealing | Close the chamber and winding system to create a sealed environment. |
Vacuum Pumping | Generate a vacuum environment to prepare for the coating process. |
Start Coating | Activate the winding system, initiate evaporation sources, and begin deposition. |
End Coating | Complete the deposition process, shut down the evaporation source, stop wire feeding, gas supply, and winding system. |
Vacuum Release (Ventilation) | Release vacuum pressure by allowing air back into the chamber. |
Open Chamber | Open the chamber for unloading. |
Unloading & Equipment Cleaning | Remove the coated film rolls and clean the equipment for the next cycle. |
Shutdown Vacuum System | Turn off the vacuum system and end the operation. |
End | The coating process is complete. |
Basic Characteristics:
1. Vacuum Chamber
2. Pumping Group
3.Winding System
4. Process Drum
5. Polycold System
6. Metal Evaporation System
7. Optical Density System
8. Cooling Water Manifold
9. Electrical Cabinet And Operator Panel
10. Machine Management And Control
11. Trouble Shooting
12. Supervisor Mode
Packaging & Delivery
1. Prompt delivery;
2. Professional logistic agent;
3. Well-trained and disciplined packing team;
4. After-sale service: Any questions or problems after receiving the product, please feel free to contact us. Problems would be solved for you immediately.
Competitive Advantages
1. We offer high quality products at competitive price;
2. customs clearance is guaranteed;
3. Good after-sale service;
4. Flexible payment terms;
5. With excellent products and efficient services, we are well known both at home and abroad.
Our Factory
FAQ
Q: Is Dongsheng a factory or trading company?
A: Dongsheng is a factory.
Q: Where is your factory located? Can I visit it before I place an order?
A: Our factory is located in Hefei, Anhui,China; Warm welcome to visit our factory.
Q: Which countries have you exported to?
A: We have exported our products to all over the world, such as Europe, USA, Japan, Korea, India etc.
Q: How about the warranty and after-sale service?
A: We provide 12 months warranty and lifetime technic suport for all machinery.
The response is available within 12 hours while the solution for the troubleshooting is provided within 48 hours.
Q. Machine installation
A. We could assign the technician to the place for the on-site installation if requested by the purchaser.